There are three big processes here:
1. The checklist above about general things that should be done (high level)
2. Doing all of the package building
3. Signing and publishing the packages
There is a script you saw that handles 3, that’s push button. 2 used to be a script in tools but regressed a lot and is now a gap in our tooling and processes